Priority Purchase

Introduction

Renewabl energy generation is exempted from merit order dispatch operation and is designated as “must run” in order to fully utilize the available generation of intermittent nature

Rationale

  • Fully utilize the available generation.

Basic elements of design

Not considered as part of merit order stack while arriving or assessing the cost of power purchase.

Potential challenges

In low demand conditions, other sources are curtailed to absorb this high cost infirm power.

India experience

The concept is followed by all regulatory commissions.